To be on our WhatsApp platform COST YOU NOTHING, all we require is that you deliver a first-class job to the customer. Do EICR and remedials at the same time using our price list below, and the customer pays YOU DIRECTLY.
| Example of EICR + Remedials | |
|---|---|
| EICR | Customer Pays You Directly |
2 bedroom property |
£139 |
| Remedial Work | |
| Install 6 x Way Dual 80A RCD with SPD Consumer Unit | £467 |
| Replace 25mm Meter Tails Pack | £63 |
| YOU GET (Customer pays the electrician directly) | £669 |
| Remedials List | |
|---|---|
| Remedial issues | Customer pays you directly |
Replace Single or Double sockets that need to be replaced. |
Replace Single Socket |
Replace Double Socket |
|
Replace USB Double Socket |
|
Replace Fused Spur |
|
| Replace an old ceiling light that is damaged |
Replace Lighting Pendant |
| Remedial issues | Customer pays you directly |
|---|---|
| Install a new consumer unit because it might be cheaper than replacing the MCB’s with RCBO’s or the Main switch for a 30mA RCD Main Switch |
|
|
|
Install 13 x Way Dual 100A RCD with SPD Consumer Unit |
|
| Main meter tails need increasing from 10mm / 16mm to 25mm |
Replace 25mm Meter Tails Pack (3m) |
| Important 10 mm earth equipotential bonding are missing or damaged and their parts must be replaced |
Replace or Install 10mm Earth Cable |
| Remedial issues | Customer pays you directly |
|---|---|
| The MCB must be replaced or re-installed with a Residual-Current Breaker (RCBO) which will trip at 30mA |
Install RCBO 6A – 40A |
| The Main Residual-Current Device (RCD) must be replaced. |
Replace Devices 100A 30mA |
| The Miniature Circuit Breaker (MCB) must be replaced, because Fuses or MCBs must be rated lower than the maximum current carrying capacity of the circuit conductors. |
Install MCB 6A - 40A |
| Wires in the home must be secured or re-secured Keep electrical wires protected with this 25mm x 16mm mini trunking. |
Replace or Install Mini Trunking |
| The replacement of standard 1 or 2 gang light push switch dimmer switches. |
Replace Single Socket |
| Remedial issues | Customer pays you directly |
|---|---|
| Holes around the sides of enclosures (distribution boards, surface mounted boxes sockets and switches), which allow access to live parts within, like paper clips, sweet wrappers, or fingers |
Replace Single Back Box |
Replace Double Back Box |
|
| Live parts within distribution boards being accessible to touch. This may occur where blanking inserts, which are fitted into unused ways of distribution boards, have been removed |
Install MCB Blank |
| The replacement of standard 1, 2, 3 & 4 gang light switches. These light switches control light fixtures |
Replace 1 or 2G Light Switch |
Replace 3 or 4G Light Switch |
| Remedial issues | Customer pays you directly |
|---|---|
| Cooker switches may need to be replaced |
Replace 45A Cooker Switch |
Replace Cooker Unit Switched Socket |
|
| Shower pull switch may need to be replaced |
45A DP Ceiling Pull Switch |
| Bathroom light fixtures may need fixed or replaced |
Replace Bathroom Ceiling Light with LED IP44 |
| Bathroom pull switch may need fixed or replaced |
Replace Single Socket |
| Remedial issues | Customer pays you directly |
|---|---|
Replacing missing blanking plates used to cover switches or sockets |
Replace Blank Plate 1 & 2G |
| Labour Charge with a Van full of Tools and Testers. My first hour is the most expensive because of travel expenses. |
1st hour Labour |
3 hours Labour |
|
6 hours Labour |
|
12 hours Labour |
Electricians pay us NOTHING, customer pays us £30 for locating the local electrician.